Metrovalencia · Summer

Metro summer closure: accessible alternatives between Alameda and Marítim

Every summer, Metrovalencia's upgrade works force temporary closures on stretches of lines 5 and 7, in particular the Alameda–Marítim axis linking the centre with the seafront. For most people it is a nuisance; for anyone who depends on the lift and low-floor boarding, it can unravel the whole route. These are the genuinely accessible alternatives, verified.

Updated July 2026 · seasonal guide

The exact dates and stations of the closure change every year. Check the official notice for the current summer at metrovalencia.es before travelling; this guide is reviewed every June.

What closes and when

The summer closures affect the underground stretch between Alameda and Marítim on lines 5 and 7, the corridor joining the centre (Colón, Xàtiva, Alameda) with Marítim, where you connect to the trams towards the beaches. FGV uses the lower-demand months for works that cannot be done with the line running.

During the closure FGV runs a replacement service between the affected stations. Our accessible recommendation depends on your origin and destination: often the best option is not the replacement bus but the regular network.

The alternatives, in order of accessible reliability

EMT buses: the 100% accessible network

The entire EMT fleet carries a double ramp and two wheelchair spaces by bylaw, with no lifts involved: it is the most robust alternative during the closure. Several daytime lines link the city-centre axis with the Poblats Marítims and the Marina; check them on the real-time map before setting off.

The tram from Marítim: flat and lift-free

Marítim interchanges with trams L6 and L8, which run at street level: level boarding, no stairs and no lifts in between. If you are heading to the beach or the seafront axis, the tram is the natural accessible connection once past the closed stretch.

FGV's replacement service, with one check first

FGV runs a replacement service during the works. Before relying on it, confirm in the official notice that the assigned vehicles are low-floor with a ramp: in previous summers the allocation has varied by stretch and time of day.

To pick a line with fresh data, use the real-time transport map or the EMT lines directory: each line page shows its route, stops and connections.

PRM tips for the transfer

  • Check the lift at your departure station before leaving: if there is only one per level and it is out of order, rethink the route from the start (Colón is the station with duplicate lifts).
  • On the bus, ask for the ramp without hesitation: the driver is required to deploy it and, if it fails, to call for an adapted replacement vehicle.
  • Avoid the closure's peak times (early morning and the beach return): the bus has only one or two wheelchair spaces, and replacement buses run full.
  • If you use FGV's lift remote, remember Marítim and Colón are among the 16 equipped stations: it serves you at both ends of the closure.

Frequently asked questions

Which Valencia metro lines close in summer?

The summer works closures have historically affected the Alameda–Marítim stretch of lines 5 and 7. The exact dates and stations change every year: check the current summer's official notice at metrovalencia.es.

Is the metro replacement bus accessible?

FGV runs a replacement service during the works, but the vehicles may vary. EMT's regular network, 100% accessible by bylaw, is the most reliable wheelchair alternative; check the official notice if you prefer the replacement bus.

How do I reach the beach by wheelchair during the closure?

The most robust combination: an EMT bus to the seafront area and, where convenient, tram L6 or L8 from Marítim, both with street-level boarding. The real-time map shows which line leaves you closest.

When does normal metro service resume?

The closures are usually concentrated in July and August and service resumes before the school year starts. FGV publishes the exact date in its official notice; this guide is updated every June with the year's closure.

Keep reading